Incorporating BIM in the final semester undergraduate project of construction management — a case study in Fuzhou University

Wang, Liyuan, Yan, Xueyuan, Fan, Binghui, Jin, Ruoyu, Yang, Tong ORCID logoORCID: https://orcid.org/0000-0002-1254-5628 and Kapogiannis, Georgios (2020) Incorporating BIM in the final semester undergraduate project of construction management — a case study in Fuzhou University. KSCE Journal of Civil Engineering, 24 (8) . pp. 2403-2418. ISSN 1226-7988 [Article] (doi:10.1007/s12205-020-1971-4)

[img]
Preview
PDF - Final accepted version (with author's formatting)
Download (1MB) | Preview

Abstract

This pedagogical study presents building information modeling (BIM) education in the final semester construction management (CM) program. The case study conducted in Fuzhou University extends BIM education from a single BIM course in earlier undergraduate years to the senior year’s final semester project, which was designed to enable BIM utilization in multiple construction tasks (e.g., 3D site planning). This study consists of two major parts. The first part starts with the newly designed course of the final semester project of CM students. Students’ final semester project work is demonstrated depending on their selected deliverable type, which includes full BIM application group work, two partial BIM application types (i.e., construction planning/scheduling, and take-off estimate), and a research dissertation. The second part starts from the research hypothesis of whether the different deliverable type selected by students would affect their perceptions towards the final project and their professional career. Based on a follow-up questionnaire survey to the whole CM student sample aiming to test the hypotheses with statistical analyses (e.g., analysis of variance and the post-hoc analysis), it was indicated that all the four different deliverable types (i.e., subgroups) could lead to consistent perceptions of the final semester project towards their career development. However, subgroup differences were found. For example, students from the subgroup of full BIM application perceived that they had the highest level of hands-on skill enhancement throughout the project, possibly due to the fact that they linked BIM software tools to virtual reality (VR) hardware. Suggestions were provided to update the future BIM pedagogy in the final semester project, such as proper guide of CM students to opt their project deliverable type depending on their career interests, motivations in BIM utilization, and skill development needs. This current study provides insights in BIM education in terms that: 1) BIM education could be enhanced from a single course level to the senior year project in the CM program level; 2) different options offered in the final stage project within the CM curriculum might affect students’ perceptions towards BIM or their career development; and 3) the experience learned from this case study could be shared in the global community of construction education to update the curriculum incorporating information and communication technologies (e.g., BIM and VR). Future educational work in BIM could continue adopting existing educational theories (e.g., Bloom’s Taxonomy) by addressing the various levels of student learning, and viewing BIM in the bigger picture of digital construction.

Item Type: Article
Research Areas: A. > School of Science and Technology
Item ID: 33765
Notes on copyright: This is a post-peer-review, pre-copyedit version of an article published in KSCE Journal of Civil Engineering. The final authenticated version is available online at: https://doi.org/10.1007/s12205-020-1971-4
Useful Links:
Depositing User: Tong Yang
Date Deposited: 02 Sep 2021 10:45
Last Modified: 29 Nov 2022 18:19
URI: https://eprints.mdx.ac.uk/id/eprint/33765

Actions (login required)

View Item View Item

Statistics

Activity Overview
6 month trend
231Downloads
6 month trend
63Hits

Additional statistics are available via IRStats2.